User Tools

Site Tools


3d_prints:instructions:conventional:step2

This is an old revision of the document!


Step 2 – Install the Reducer Base

Place the reducer base onto the base and slide it to the back until it locks.

Step 2.1 – Position the Gearbox

Place the gearbox directly onto the reducer base.

2a.jpg


Step 2.2 – Align the Guide Rails

Ensure the gearbox rails align with the reducer base channels.

2b.jpg


Step 2.3 – Slide to Lock

Push the gearbox straight to the right until it locks into place.

2c.jpg

Do not twist the gearbox while installing.


⬅ Previous Step

Next Step ➜

3d_prints/instructions/conventional/step2.1773186665.txt.gz · Last modified: by unexpectedlee

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki