User Tools

Site Tools


3d_prints:instructions:conventional:step1

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
3d_prints:instructions:conventional:step1 [2026/03/12 23:00] unexpectedlee3d_prints:instructions:conventional:step1 [2026/03/14 22:07] (current) unexpectedlee
Line 2: Line 2:
  
 <WRAP info> <WRAP info>
-<WRAP em>Parts</WRAP> +New Parts needed for this step: 
-Gearbox +  - Gearbox 
- +  - Reducer Base
-*Reducer Base +
- +
-  - Check beam alignment +
-  - Verify pitman arms move freely +
-  - Ensure belt is properly installed+
 </WRAP> </WRAP>
  
Line 40: Line 35:
 <WRAP group> <WRAP group>
 <WRAP quarter column> <WRAP quarter column>
-[[3d_prints:instructions:conventional:start|⬅ Previous Step]]+[[3d_prints:instructions:conventional:parts|⬅ Parts]]
 </WRAP> </WRAP>
  
3d_prints/instructions/conventional/step1.1773356419.txt.gz · Last modified: by unexpectedlee

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki